Haworth Engineering

Excellency in the Details
Home
Site Map
MannM Railroad (G)
Original Plans
Finished Layout
Water Features
Rack Railway
Transition Track
Train Room
The Shop
Summer 2010
Summer 2009
Main 1/2 Construction
First Run
Interior Construction
OE & RhB Line
Shay & Forney Lines
MannM Railroad (HO)
Maintenance of Way
Bicentennial
Spreader
The Super Chief
Business Cars
GE C44-9W
EMD SD45
Amtrak Coast Starlight
Amtrak Surfliner 799
Pacific Surfliner
Locations
R&F Railroad
About Me
Contact Me
      The newest addition, affectionately known as the train room, will be the control nerve center for the layout. The trains are also stored here and some can even be run out of the building using the transition track. The control area is still a future project.


     Here are a few pictures of the train storage area. The cabinets are 22' X 8' X 26" and have approximately 500' of storage track.



     The bottom two shelves can run out of the building and onto the layout.







     These Christmas trains started it all 16 long years ago.



The first train under the tree