Haworth Engineering

Excellency in the Details
Home
Site Map
MannM Railroad (G)
Original Plans
Finished Layout
Water Features
Rack Railway
Transition Track
Train Room
The Shop
Summer 2010
Summer 2009
Main 1/2 Construction
First Run
Interior Construction
OE & RhB Line
Shay & Forney Lines
MannM Railroad (HO)
Maintenance of Way
Bicentennial
Spreader
The Super Chief
Business Cars
GE C44-9W
EMD SD45
Amtrak Coast Starlight
Amtrak Surfliner 799
Pacific Surfliner
Locations
R&F Railroad
About Me
Contact Me
                                    Summer ’10 at the MannM RR

     Another successful summer is behind us. The water features were completed which involved finishing the creeks and ponds and installing a pool pump to move the water. The transition track was completed as well as the display case. The Orient Express and RhB tracks were installed and the Rack Railway was built from the ground up. Three new arch bridges were made from concrete to support the RhB and Uintah spur. The Uintah spur was not in the original plans, but it now will be tied into the Orient Express line. All of the heavy construction and masonry work is finished; plants, lighting, buildings, and electric work have yet to be completed.


RhB running behind the waterfall


All three new lines in action


Running into the building


One of the new bridges