Haworth Engineering

Excellency in the Details
Home
Site Map
MannM Railroad (G)
Original Plans
Finished Layout
Water Features
Rack Railway
Transition Track
Train Room
The Shop
Summer 2010
Summer 2009
Main 1/2 Construction
First Run
Interior Construction
OE & RhB Line
Shay & Forney Lines
MannM Railroad (HO)
Maintenance of Way
Bicentennial
Spreader
The Super Chief
Business Cars
GE C44-9W
EMD SD45
Amtrak Coast Starlight
Amtrak Surfliner 799
Pacific Surfliner
Locations
R&F Railroad
About Me
Contact Me
                                    Summer ’09 at the MannM RR

     Well, this summer has been extremely busy at the railroad!!! All the stars have come into alignment and given us the chance to make giant progress on the layout.  A new control room has been constructed, all of the waterfalls are complete, a majority of the walls have stone on them now, and some other very unique features have been added. We’re still not done, but a huge chunk of work has been completed.


Here are some before and after pictures:

 

 

Waterfalls

 

 

 

 

 

Cool new features...

   The first new thing is the foundation for the track from the control room to the layout. One hundred and seventy feet of storage will be able to run out to the mainlines. Below, one shelf is in and the other is outlined in blue.

 

Here is the view from the outside of the building. The red line indicates the track.

 

Again, red line is for future track. A removable bridge will span the gap when trains are brought in and out.

 

Next is the pond area. The red line is where a future track will be. Water will fall off the slate, over the train, and into the pond. A groove has been cut in the slate so that water will “sheet” over instead of trickle over the fall.

 

 

A cement two track arch bridge was constructed…

 

…as well as the Hoover Dam.

 

Shay Area

The shay area was almost completed this summer. All the rock has been put up along the walls, a separate water feature added, and two new tunnel entrances created.