Haworth Engineering

Excellency in the Details
Home
Site Map
MannM Railroad (G)
Original Plans
Finished Layout
Water Features
Rack Railway
Transition Track
Train Room
The Shop
Summer 2010
Summer 2009
Main 1/2 Construction
First Run
Interior Construction
OE & RhB Line
Shay & Forney Lines
MannM Railroad (HO)
Maintenance of Way
Bicentennial
Spreader
The Super Chief
Business Cars
GE C44-9W
EMD SD45
Amtrak Coast Starlight
Amtrak Surfliner 799
Pacific Surfliner
Locations
R&F Railroad
About Me
Contact Me
      I always knew that we would have a rack train running through our layout. I had a general idea about where I wanted the two stations, but it was not until the waterfalls were built and the European section cleared of construction debris, that I knew exactly what I wanted. One station is located next to the waterfall and the other would be next to the European station. There was a large problem in the way - how to connect the two stations! The track would have to cross over the creek, weave behind the Shay line and cross over the Orient Express, then start to descend as it crossed the RhB to get to the Euro station.

     The plan was to build an arched viaduct out of concrete to connect the two stations. Seventeen arches in total were constructed using coffee cans, paint cans, and wood forms as a guide. An LGB reversing unit controls the railway. The 43 foot long line descends 19 inches as it weaves through the layout. It was an engineering trick to connect points A and B to say the least!


Euro Station


An immediate U turn points the train towards the falls


Climbing the grade




The largest bridge on the rack railway crosses over the RhB line


The only bridge not to be made of concrete takes us across the Orient Express track




Waterfall Station